Allied-telesis AT-FS716L Instrukcja Użytkownika Strona 28

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 27
Chapter 2: Installation
28
Warning
Power cord is used as a disconnection device: To de-energize
equipment, disconnect the power cord. 5
6. Verify that the POWER LED is green. If the LED is OFF, refer to
“Troubleshooting” on page 34 for instructions.
Note
The switch perform a self-diagnostic test upon power up. This takes
about 20 seconds to complete.
7. Power ON the end-nodes connected to the switch.
8. Check that all the L/A LEDs are either green or orange. If any of the
LEDs is OFF, refer to “Troubleshooting” on page 34 for instructions.
The switch is now ready for use.
Przeglądanie stron 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 61 62

Komentarze do niniejszej Instrukcji

Brak uwag