Allied-telesis AT-FS724i Instrukcja Użytkownika Strona 23

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 22
AT-FS716 Series and AT-FS724i Installation Guide
11
8. Check that the LINK/ACTIVITY LED for each port on the switch is green.
If a LED is OFF, refer to “Troubleshooting” on page 15.
The switch is now ready for use.
Rackmounting the Switch
The AT-FS716 and AT-FS724i switches can be used on a desktop or installed
in a rack. For desktop installation, refer to “Installing the Switch on a Table or
Desktop” on page 10.
To install the AT-FS716 or AT-FS724i in a rack, perform the following
procedure:
1. If attached, remove the four protective feet from the bottom of the switch as
shown in Figure 6.
Figure 6 Removing the Rubber Feet
2. Remove the data cables and power cord from the switch.
Przeglądanie stron 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 43 44

Komentarze do niniejszej Instrukcji

Brak uwag