Allied-telesis AT-GS908 Instrukcja Użytkownika Strona 34

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 33
Troubleshooting
24
Verify that the ACT LED for each port is ON. If a ACT LED is OFF, do the
following:
Verify that the end-node connected to the port is powered ON
and is operating properly.
Verify that the twisted pair cable is securely connected to the port
on the switch and to the port on the end-node.
Ensure that the twisted pair cable does not exceed 100 meters
(328 feet).
Verify that you are using the appropriate category of twisted pair
cable: Category 3 or better for 10 Mbps operation and Category 5
and Category 5E for 100 and 1000 Mbps operation.
Note
A 1000Base connection can take from five to ten seconds for the
link to be established.
Przeglądanie stron 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 51 52

Komentarze do niniejszej Instrukcji

Brak uwag