Allied-telesis AT-TQ3600 Instrukcja Użytkownika Strona 48

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 70
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 47
Chapter 2: Installing the Access Point
48
Figure 24. Tightening the Captive Screw
7. Close the front panel.
8. If you have not already done so, connect the network cable from the
wireless access point to a port on an Ethernet switch.
9. Do one of the following:
If the access point is using PoE, the installation is complete. Go to
“Installing Anti-theft Devices” on page 50 or “Starting the Initial
Management Session on the Access Point” on page 51.
If the access point is using the AT-TQ0091 AC/DC Power Adapter,
perform the rest of this procedure to check and, if necessary,
change the AC plug on the adapter.
Przeglądanie stron 47
1 2 ... 43 44 45 46 47 48 49 50 51 52 53 ... 69 70

Komentarze do niniejszej Instrukcji

Brak uwag