Allied-telesis AT-VIEW PLUS 3.1 DEVICE MANAGEMENT Instrukcja Użytkownika Strona 139

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 277
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 138
Allied Telesyn AT-VIEW PLUS
DEVICE MANAGEMENT
AT-AR745-DC
Device Manager LEDs for AT-AR745
LED State Description
PWR
Green
Red
The router is receiving power from the main power supply
unit.
The main PSU has failed.
RPS
Green
Red
Gray
The router is receiving power from the redundant power
supply.
RPS has failed.
RPS is not installed or RPS monitoring is disabled.
Device Manager LEDs for AT-AR745-DC
LED State Description
PWR Green The router is receiving power from the main power supply unit.
Note - Please refer to Port Interface Cards (PICs) for the operations and behavior of the Port
Interface Cards installed in this device.
Note - Please refer to Network Service Modules (NSMs)
for the operations and behavior of the
Network Service Modules installed in this device.
PN 613-50665-00 Rev B Page 139 of 277
Przeglądanie stron 138
1 2 ... 134 135 136 137 138 139 140 141 142 143 144 ... 276 277

Komentarze do niniejszej Instrukcji

Brak uwag