Allied-telesis FS970M Series Instrukcja Użytkownika Strona 60

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 59
Beginning the Installation
60
The AT-FS970M/24PS, AT-FS970M/24F, AT-FS970M/48PS,
AT-FS970M/16F8-LC, and AT-FS970M/16F8-SC Switches come with the
components listed in Figure 19.
Figure 19. Components of the AT-FS970M/24PS, AT-FS970M/24F,
AT-FS970M/48PS, AT-FS970M/16F8-LC, and AT-FS970M/16F8-SC
Switches
Two rack mounting brackets
One 2 m (6.6 ft) local management cable with
RJ-45 (8P8C) and DB-9 (D-sub 9-pin)
connectors.
Eight bracket screws
Two regional AC power cords
Przeglądanie stron 59
1 2 ... 55 56 57 58 59 60 61 62 63 64 65 ... 105 106

Komentarze do niniejszej Instrukcji

Brak uwag