Allied-telesis SwitchBlade Switch Controller Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Sprzęt komputerowy Allied-telesis SwitchBlade Switch Controller. Allied Telesis SwitchBlade Switch Controller User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 12
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
SwitchBlade Switch Controller
Quick Install Guide
Przeglądanie stron 0
1 2 3 4 5 6 ... 11 12

Podsumowanie treści

Strona 1

SwitchBlade Switch ControllerQuick Install Guide

Strona 2

10 SwitchBlade Switch ControllerC613-04031-01 REV CFor instructions on using ASYN0 and the CLI to change ETH0’s IP address, see the Using the Graphica

Strona 3 - Package Contents

Quick Install Guide 11C613-04031-01 REV CSwitch Controller LEDsThe following LEDs will operate if the switch controller is receiving power. The Switch

Strona 4

12 SwitchBlade Switch ControllerC613-04031-01 REV CDocumentation And Tools CD-ROMThe Documentation and Tools CD-ROM bundled with every switch controll

Strona 5

SwitchBlade Switch Controller Quick Install GuideDocument Number C613-04031-01 REV C.Copyright © 2002-2005 Allied Telesyn International, Corp. 19800 N

Strona 6 - Figure 3: Ejector levers

Quick Install Guide 3C613-04031-01 REV CModels Covered By This GuideThis Quick Install Guide includes information on installing the following card: A

Strona 7 - Extractor lever

4 SwitchBlade Switch ControllerC613-04031-01 REV CRelated items that can be purchased separately: CPU memory pack, 256 MByte DRAM (2 x 128 MByte DIMM

Strona 8

Quick Install Guide 5C613-04031-01 REV CFigure 1: ESD socket on the SwitchBlade 8 chassis.5. Install the CPU memory packOnly Allied Telesyn supplied D

Strona 9

6 SwitchBlade Switch ControllerC613-04031-01 REV C7. Prepare the switch controller bayRemove the switch controller bay faceplate or existing switch co

Strona 10 - C613-04031-01 REV C

Quick Install Guide 7C613-04031-01 REV CWhen inserting a switch controller, take care to slide the back-panel along both guides at an equal rate. If a

Strona 11

8 SwitchBlade Switch ControllerC613-04031-01 REV CFor DC chassis models, ensure that:• The correct DC terminal blocks on the chassis’s rear panel are

Strona 12

Quick Install Guide 9C613-04031-01 REV C3. Check the power supplyEnsure the chassis’s standby switch is in the Run position and the switch controller

Komentarze do niniejszej Instrukcji

Brak uwag