Allied-telesis SwitchBlade x3112 Instrukcja Użytkownika Strona 134

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 133
Chapter 6: Installing the Transceivers and Cabling the Ports
134
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 4 to install
the remaining SFP transceivers in the line cards.
5. Remove the protective cover from the SFP transceiver, as shown in
Figure 88.
Figure 88. Removing the Dust Cover from the SFP Transceiver in the AT-
SBx31GS24 Line Card
Note
The dust cover protects the fiber optic port on the SFP transceiver
from dust contamination. It should not be removed until you are
ready to connect the fiber optic cable.
Przeglądanie stron 133
1 2 ... 129 130 131 132 133 134 135 136 137 138 139 ... 221 222

Komentarze do niniejszej Instrukcji

Brak uwag