Allied Telesis AT-iMG606BD Przewodnik Instalacji Strona 33

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 32
AT-iMG606BD Multiservice Gateway Installation Guide
33
Installing the AT-iMG606BD Multiservice Gateway
To install the AT-iMG606BD Multiservice Gateway, perform
the following procedure:
1. Remove all equipment from the package and store the
packaging material in a safe place.
2. Prepare the fiber optic cable by installing an SC
connector on the end that is going to connect to the
gateway.
The base unit has three parts, as shown in Figure 7.
Figure 7. Parts of the Base Unit
383
Connector shield
Base
Cover
Przeglądanie stron 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 79 80

Komentarze do niniejszej Instrukcji

Brak uwag