Allied Telesis AT-SBX81XS6 Przewodnik Instalacji Strona 231

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 230
SwitchBlade x8112 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis 231
Figure 149. Reinstalling the Screws on the Positive and Negative
Terminals
8. Slide the plastic cover to the left and lightly tighten the two screws to
secure it in place. Refer to Figure 150 on page 232.
Caution
Do not over tighten the screws or you may crack or break the plastic
cover.
The plastic cover may not be present if the lead wires were connected
to the terminal block with the right angle terminals. If this is the case,
you may either skip this step or reinstall the plastic cover on the power
supply.
Przeglądanie stron 230
1 2 ... 226 227 228 229 230 231 232 233 234 235 236 ... 313 314

Komentarze do niniejszej Instrukcji

Brak uwag