Allied Telesis Switch AT-S95 Instrukcja Użytkownika Strona 1

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Switche sieciowe Allied Telesis Switch AT-S95. Allied Telesis Switch AT-S95 User's Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 11
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
PN 613-001778 Rev A 1
AT-S95 Version 2.0.0.27
AT-8000GS Switch
Software Release Notes
Please read this document before you begin to use the management software.
The following topics are included in this document
“Supported Platforms” on page 1
“New Features” on page 2
“Operational Notes” on page 2
“Resolved Issues” on page 2
“Known Issues” on page 2
“Upgrade Procedure” on page 4
“Product Documentation” on page 8
“Where to Find Product Information and Management Software Updates” on page 8
“History of Previous Versions” on page 8
“History of Resolved Issues” on page 8
“History of New Features” on page 9
“Contacting Allied Telesis” on page 10
Supported Platforms
The following platforms are included in the AT-8000GS family of devices:
AT-8000GS/24 switch— 24 GE ports with modular configuration 4 x combo 10/100/1000 SFP
ports and 2 HDMI interface 5G stacking ports.
AT-8000GS/24POE switch— 24 GE ports with modular configuration 4 x combo 10/100/1000
SFP Combo ports and 2 HDMI interface 5G stacking ports, with support for Power over
Ethernet; class 2 devices (max 7.3W) on all ports or class 3 devices (max 15.4W) on 12
ports.
AT-8000GS/48 switch— 48 GE ports with modular configuration 4 x combo 10/100/1000 SFP
Combo ports and 2 HDMI interface 5G stacking ports.
Caution
Insure that the latest Boot Loader (Version 2.0.0.1) is installed on your AT-8000GS switch
or stack of switches before upgrading the management software to Version 2.0.0.27.
Przeglądanie stron 0
1 2 3 4 5 6 ... 10 11

Podsumowanie treści

Strona 1 - Software Release Notes

PN 613-001778 Rev A 1AT-S95 Version 2.0.0.27AT-8000GS Switch Software Release NotesPlease read this document before you begin to use the management so

Strona 2 - Known Issues

AT-S95 Version 2.0.0.27 Software Release NotesPN 613-001778 Rev A 10 Allied Telesis, Inc.Contacting Allied TelesisIf you need assistance with this pro

Strona 3

AT-S95 Version 2.0.0.27 Software Release NotesPN 613-001778 Rev A 11 Allied Telesis, Inc.Contacting Allied TelesisIf you need assistance with this pro

Strona 4

AT-S95 Version 2.0.0.27 Software Release NotesPN 613-001778 Rev A 2 Allied Telesis, Inc.The AT-8000GS/24, AT-8000GS/24POE, and AT-8000GS/48 switches

Strona 5

AT-S95 Version 2.0.0.27 Software Release NotesPN 613-001778 Rev A 3 Allied Telesis, Inc.Security (port lock): Port security mechanism is not triggere

Strona 6 -  Download

AT-S95 Version 2.0.0.27 Software Release NotesPN 613-001778 Rev A 4 Allied Telesis, Inc.Upgrade ProcedureThis section describes how to upgrade the AT-

Strona 7

AT-S95 Version 2.0.0.27 Software Release NotesPN 613-001778 Rev A 5 Allied Telesis, Inc.6. Reboot the device with the following command:console# reloa

Strona 8 - History of Resolved Issues

AT-S95 Version 2.0.0.27 Software Release NotesPN 613-001778 Rev A 6 Allied Telesis, Inc.The File System tab is displayed. See Figure 2 on page 6.Figur

Strona 9 - CLI Command Description

AT-S95 Version 2.0.0.27 Software Release NotesPN 613-001778 Rev A 7 Allied Telesis, Inc.8. Click OK.9. In the Source File Name field, type the filenam

Strona 10 - Contacting Allied Telesis

AT-S95 Version 2.0.0.27 Software Release NotesPN 613-001778 Rev A 8 Allied Telesis, Inc.17. Click the Reset button.The switch is rebooted.Product Docu

Strona 11

AT-S95 Version 2.0.0.27 Software Release NotesPN 613-001778 Rev A 9 Allied Telesis, Inc.In some cases where more than one switch has the same STP Bri

Komentarze do niniejszej Instrukcji

Brak uwag