Chapter 2: Installation
30
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the switch package has the following hardware
components. If any item is missing or damaged, contact your Allied
Telesis sales representative for assistance.
One AT-FS750/16 or AT-FS750/24 Smart Switch
Two rack-mount brackets
Eight rack-mount bracket screws (black)
Four rack-mounting screws (stainless steel)
Four rubber feet (for desktop use)
One management cable
One power cord
Documentation CD