Allied-telesis AT-x510DP-52GTX Instrukcja Użytkownika Strona 105

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 104
x510DP-52GTX Installation Guide
105
2. Wait two or three minutes for the switches to select a master switch
and to assign the ID numbers.
At this point, the stack is operational. The ID numbers are
automatically stored in special files in the flash memories of the
switches and are retained by the devices even if you reset or power
cycle the stack.
3. To continue with the installation, go to “Verifying the Stack” on
page 106.
Przeglądanie stron 104
1 2 ... 100 101 102 103 104 105 106 107 108 109 110 ... 128 129

Komentarze do niniejszej Instrukcji

Brak uwag