Allied Telesis AT-iMG7x6MOD series Instrukcja Instalacji Strona 32

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 31
AT-iMG646MOD Installation Guide
32 Chapter 4: Installing the Gateway Indoors
Connecting the Ground Wire
To connect the ground wire, perform the following procedure:
1. Prepare an adequate length of 14AWG stranded grounding wire for the ground connection.
2. Strip 0.25 in.(0.7 cm) of insulation from the ground wire and crimp it into the ground wire ring lug.
3. Secure the ring lug on the stud with a washer and #8-32 Kepnut, as shown in Figure 21.
Figure 21. Securing the Ground Wire Lug
4. Trim and connect the other end of the ground wire to any ground point according to National Electrical
Codes.
Przeglądanie stron 31
1 2 ... 27 28 29 30 31 32 33 34 35 36 37 ... 55 56

Komentarze do niniejszej Instrukcji

Brak uwag